Difference between revisions of "Poltroon Class Submarine"

From ShireWiki
Jump to: navigation, search
m
m
 
(16 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[File:Poltroon1.png|thumb|right|<div class="center" style="width: auto; margin-left: auto; margin-right: auto;">ESB Poltroon Class Nuclear Submarine</div>]]
+
{| class="toccolours" style="float:right; margin: 0 0 1em 1em; font-size: 85%; width: 30em;background-color:#FFEFEF;border:1px solid #B82C20;"
  
The Poltroon Class of Nuclear Submarines was authorised by the Chief Secretary of the [[Shirerithian Military|Imperial Forces]] in 1635.6110. The class represents an evolution of the hull design of the [[https://en.wikipedia.org/wiki/Astute-class_submarine Asleep-class]] submarine employed by the [http://bastionunion.org/forum/viewtopic.php?t=10300 Musican Navy]. Any similarities with submersible vehicles of Minarborian [http://shyriathsden.net/minarboria/forum/viewtopic.php?f=5&t=357 origin] are entirely [http://bastionunion.org/forum/viewtopic.php?f=802&t=17062 coincidental].
+
|align=center colspan=2 | <h2 style="margin:0;background-color:#B82C20;font-size:120%;font-weight:bold;border:1px solid #B82C20;text-align:left;color:#fff;padding:0.2em 0.4em;"> <center>'''Poltroon Class'''
 
+
|-
==Class Overview==
+
| align=center colspan=2 |
{|  
+
[[Image:Poltroon1.png|250px]]</center>
 +
|-
 +
|'''Type:'''|| Nuclear Attack Submarine
 +
|-
 +
|'''Place of origin:'''|| [[Shireroth]]
 +
|-
 +
| align=center colspan=2 |
 +
----
 +
|-
 +
|'''In service:''' || 1636 [[AN]] - Present
 +
|-
 +
|'''Used by:''' ||
 +
[[File:New_flag_Shireroth.png|25px|left]] [[Navy of Shireroth|Imperial Shirerithian Navy]]
 +
|-
 +
|'''Planned'''|| 105
 
|-
 
|-
|'''Builders:'''|| [[ESB-Jörmungandr Group]] Boat Yards of [[Amity]]
+
|'''Completed:'''||105
 
|-
 
|-
|'''Operators:'''||[[Navy of Shireroth|Imperial Shirerithian Navy]]
+
|'''Commissioned:''' || 105
 
|-
 
|-
|'''Cost:'''||  
+
|'''Retired:''' || 2
 
|-
 
|-
|'''Date in Service:''' ||
+
| align=center colspan=2 |
 +
----
 
|-
 
|-
|'''Building:'''||3
+
|'''Designed:''' || 1635 [[AN]]
 
|-
 
|-
|'''Planned:'''||0
+
|'''Manufacturer:''' || [[ESB-Jörmungandr Group]] Boat Yards of [[Amity]]
 
|-
 
|-
|'''Commissioned:'''||0
+
| align=center colspan=2 |
 +
----
 
|-
 
|-
|}
+
|'''Displacement:''' || 12,139 tons (Submerged)
 
 
==General Characteristics==
 
{|
 
!
 
!
 
 
|-
 
|-
|Type:||Nuclear Attack Submarine
+
|'''Length:''' || 132m
 
|-
 
|-
|Displacement:||
+
|'''Beam:''' || 12m
 
|-
 
|-
|Length:||132 m
+
|'''Draught:''' || 11m
 
|-
 
|-
|Beam:||
 
 
|-
 
|-
|Draft:||
+
|'''Propulsion''':|| PWR2 reactor (with full submarine life core), MTU 600 kilowatt diesel generators; 
 
|-
 
|-
|Propulsion:|| PWR2 reactor (with full submarine life core), MTU 600 kilowatt diesel generators; 
+
|'''Range:'''||Unlimited, except by food supplies and maintenance requirements
 
|-
 
|-
|Speed:||54 km/h Submerged
+
|'''Test Depth:'''||Over 300 m
 
|-
 
|-
|Range||Unlimited, except by food supplies and maintenance requirements
+
|'''Speed:''' || 54 km/h Submerged
 
|-
 
|-
|Test Depth||Over 300 m
+
|'''Complement:''' || 98 officers and enlisted, capacity of 109
 
|-
 
|-
|Complement:||98 officers and enlisted, capacity of 109
+
|'''Armament:''' || 10x [[Banshee Cruise Missiles]] (rocket/ramjet, explosive penetrator warhead, Dimethyl Mercury payload, range 2,000km) in 10 vertical launch silos<br>
 +
50x Drifting contact mines in 10 vertical ejection chutes<br>
 +
24x [[Samyaza]] Torpedo (compressed oxygen propulsion, magnetic proximity fuse, range 40,400m at 38 knots) in 4 tubes
 
|-
 
|-
 
|Sensors and Processing Systems:||
 
|Sensors and Processing Systems:||
 
|-
 
|-
|Armament:||10x Banshee Cruise Missiles (rocket/ramjet, explosive penetrator warhead, Dimethyl Mercury payload, range 2,000km) in 10 vertical launch silos<br>
+
|'''Cost:''' || 11,709,401.71 [[Teldrin Thaler|Teldrin Thalers]]
50x Drifting contact mines in 10 vertical ejection chutes<br>
 
24x Samyaza Torpedo (compressed oxygen propulsion, magnetic proximity fuse, range 40,400m at 38 knots) in 4 tubes
 
 
|-
 
|-
 +
 +
| align=center colspan=2 |
 
|}
 
|}
 +
The Poltroon Class of Nuclear Submarines was authorised by the Chief Secretary of the [[Military of Shireroth|Imperial Forces]] in 1635. The class represents an evolution of the hull design of the [https://en.wikipedia.org/wiki/Astute-class_submarine Asleep-class] submarine employed by the [http://bastionunion.org/forum/viewtopic.php?t=10300 Musican Navy]. Any similarities with submersible vehicles of Minarborian [http://shyriathsden.net/minarboria/forum/viewtopic.php?f=5&t=357 origin] are entirely [http://bastionunion.org/forum/viewtopic.php?f=802&t=17062 coincidental].
 +
 +
The initial project, commenced in 1635 and took twelve years to complete. The first phase involved the construction of dockyard facilities in which to build and maintain the submarine type and took take six years to complete. The remaining six years saw the construction phase of the three initial submarines.
 +
 +
One dockyard was reserved for fleet maintenance whilst the other two were assigned to the purpose of constructing further boats in the same class. With improvements derived from economies of scale and efficiencies derived from improving methodologies during each build, the dockyards, located on the island of Amity, aim at a construction rate of two new boats every four years.
 +
 +
This rate of production did not prove satisfactory for the Imperial Navy and, as tensions with Jingdao worsened, a wartime tempo of submarine building was implemented, with many other projects being halted or sidelined to give over ship-building facilities to the construction of further Poltroons. The number of boatyards proliferated throughout the islands of Yardistan, Amity, Miriroth and So-Sara. By 1653 the frenetic pace of construction eased off as the ambitious targets for construction and commissioning into Imperial service were substantially met. The rate of acceptance into operational service by the Imperial Navy lagged far behind, as the shortcuts taken during the accelerated building programme had manifested themselves in a myriad of defects that were both time exhausting and expensive to rectify.
  
[[Category:Ships]][[Category:Military]]
+
The programme had benefited from the Jingdaoese war scare of 1647, which had marked the type's first extended operational deployment away from home waters.
 +
 
 +
[[Category:Ships]][[Category:ESB-Jörmungandr Group]][[Category:Weaponry]]

Latest revision as of 14:23, 15 September 2018

Poltroon Class

Poltroon1.png
Type: Nuclear Attack Submarine
Place of origin: Shireroth

In service: 1636 AN - Present
Used by:
New flag Shireroth.png
Imperial Shirerithian Navy
Planned 105
Completed: 105
Commissioned: 105
Retired: 2

Designed: 1635 AN
Manufacturer: ESB-Jörmungandr Group Boat Yards of Amity

Displacement: 12,139 tons (Submerged)
Length: 132m
Beam: 12m
Draught: 11m
Propulsion: PWR2 reactor (with full submarine life core), MTU 600 kilowatt diesel generators;
Range: Unlimited, except by food supplies and maintenance requirements
Test Depth: Over 300 m
Speed: 54 km/h Submerged
Complement: 98 officers and enlisted, capacity of 109
Armament: 10x Banshee Cruise Missiles (rocket/ramjet, explosive penetrator warhead, Dimethyl Mercury payload, range 2,000km) in 10 vertical launch silos

50x Drifting contact mines in 10 vertical ejection chutes
24x Samyaza Torpedo (compressed oxygen propulsion, magnetic proximity fuse, range 40,400m at 38 knots) in 4 tubes

Sensors and Processing Systems:
Cost: 11,709,401.71 Teldrin Thalers

The Poltroon Class of Nuclear Submarines was authorised by the Chief Secretary of the Imperial Forces in 1635. The class represents an evolution of the hull design of the Asleep-class submarine employed by the Musican Navy. Any similarities with submersible vehicles of Minarborian origin are entirely coincidental.

The initial project, commenced in 1635 and took twelve years to complete. The first phase involved the construction of dockyard facilities in which to build and maintain the submarine type and took take six years to complete. The remaining six years saw the construction phase of the three initial submarines.

One dockyard was reserved for fleet maintenance whilst the other two were assigned to the purpose of constructing further boats in the same class. With improvements derived from economies of scale and efficiencies derived from improving methodologies during each build, the dockyards, located on the island of Amity, aim at a construction rate of two new boats every four years.

This rate of production did not prove satisfactory for the Imperial Navy and, as tensions with Jingdao worsened, a wartime tempo of submarine building was implemented, with many other projects being halted or sidelined to give over ship-building facilities to the construction of further Poltroons. The number of boatyards proliferated throughout the islands of Yardistan, Amity, Miriroth and So-Sara. By 1653 the frenetic pace of construction eased off as the ambitious targets for construction and commissioning into Imperial service were substantially met. The rate of acceptance into operational service by the Imperial Navy lagged far behind, as the shortcuts taken during the accelerated building programme had manifested themselves in a myriad of defects that were both time exhausting and expensive to rectify.

The programme had benefited from the Jingdaoese war scare of 1647, which had marked the type's first extended operational deployment away from home waters.